Data center construction in 2024: Challenges and best practices

14.06.2024 | 10 min read | Written by Jessica Graham

abstract image of a data centre

Data centers are critical infrastructure components in the digital age, crucial for data storage, management, and distribution across various sectors. As the demand for cloud services, big data analytics, and internet services continues to surge, the importance of data centers has never been greater. They ensure that businesses can operate smoothly, provide quick and reliable access to information, and support the ever-growing needs of an interconnected world. 

Technological advancements are profoundly shaping the way data centers are built and operated. Recent examples of global data center construction projects known for their technological and architectural merit include the Switch Citadel Campus, Atlanta, USA, the Supernap Italia data centre in Milan, Italy, the Facebook Luleå Data Center in Sweden, and Alibaba’s hyperscale data center in Malaysia.  

Advanced building information modeling (BIM) tools are streamlining the design and construction processes, enabling more precise planning and coordination. Additionally, the incorporation of artificial intelligence and machine learning in data center management is streamlining operations, predicting maintenance needs, and ensuring optimal performance. These advancements not only enhance the functionality and future sustainability of data centers, but also prepare them to handle the complexities of future technological demands. 

Key challenges in data center construction 

  1. Technical challenges

In 2024, building data centers presents several critical challenges, mainly due to the technical complexities of modern infrastructure. Managing energy efficiency and sustainability is at the forefront of these challenges. Data centers are notorious for their high energy consumption, prompting the need for innovative solutions to reduce their carbon footprint. This includes adopting renewable energy sources such as solar and wind power, implementing energy-efficient hardware, and optimizing power usage effectiveness (PUE) metrics. These efforts not only address environmental concerns, but also help in reducing operational costs over the long term. 

Ensuring robust cooling systems is another critical technical challenge. As data centers become more powerful and densely packed with high-performance computing equipment, the heat generated can significantly impact operational efficiency and hardware lifespan. Advanced cooling technologies, such as liquid cooling and immersion cooling, are being developed to manage this heat more effectively than traditional air cooling systems. These systems can significantly reduce energy consumption associated with cooling, thereby enhancing overall energy efficiency. However, their implementation requires careful planning and significant investment, posing a substantial hurdle for data center construction. 

Incorporating advanced security measures is essential to protect the vast amounts of sensitive data housed in data centers. Cybersecurity threats are constantly evolving, necessitating robust and adaptive security infrastructures. This includes physical security measures, such as biometric access controls and surveillance systems, as well as sophisticated digital security protocols, like encryption and intrusion detection systems. Additionally, data centers must comply with various regulatory requirements and standards, which can vary significantly across regions. Balancing these security needs with operational efficiency and cost constraints remains a persistent challenge in the construction and maintenance of data centers. 

  1. Logistical challenges

Logistical challenges in data center construction are complex and multifaceted, requiring meticulous planning and coordination. One of the primary logistical hurdles is site selection and land acquisition. Choosing an optimal location for a data center involves balancing several factors, including proximity to major internet exchange points, availability of reliable power sources, and the local climate, which can affect cooling efficiency. Additionally, the site must meet zoning regulations and have the potential for expansion. Acquiring land that meets all these criteria can be both time-consuming and costly, especially in densely populated or highly regulated areas. 

Supply chain disruptions and material shortages have become increasingly prominent issues in recent years, exacerbated by global events and economic fluctuations. The construction of data centers relies heavily on a steady supply of specialized materials and components, from high-efficiency cooling systems to advanced security infrastructure. Disruptions in the supply chain can lead to significant delays and cost overruns. Managing these risks requires robust supply chain management strategies, including diversifying suppliers, maintaining adequate inventory levels, and implementing just-in-time delivery systems. However, these strategies can only mitigate disruptions to a certain extent, making this a persistent challenge in the construction industry. 

Coordinating large-scale projects and timelines is another critical logistical challenge in data center construction. Data centers are complex facilities that require the integration of numerous systems, from electrical and mechanical systems to IT infrastructure. Coordinating these various elements involves managing multiple contractors, adhering to strict timelines, and ensuring that each phase of construction aligns with the overall project plan. Delays in one area can have a cascading effect, leading to significant project delays and increased costs. Effective project management practices, including the use of advanced project management software and regular progress reviews, are essential to keeping these large-scale projects on track. Nonetheless, the inherent complexity and scale of data center construction make it a continual challenge to meet project timelines and budget constraints. 

  1. Regulatory and compliance challenges

Regulatory and compliance challenges in data center construction are critical aspects that require careful navigation. Navigating local and international regulations is often a complex process due to the varying laws and requirements across different regions. Local regulations may include zoning laws, building codes, and fire safety standards that must be meticulously followed to ensure legal compliance. On an international level, data centers must also adhere to cross-border data transfer laws and international standards, which can be particularly challenging for global companies. Compliance with these diverse regulations requires a thorough understanding of legal landscapes and often necessitates the involvement of legal experts and consultants to avoid costly legal pitfalls and ensure smooth project execution. 

Meeting industry standards and certifications is another significant challenge. Standards such as the Uptime Institute’s Tier classifications and certifications like ISO 27001 for information security management are critical for ensuring that data centers meet the highest levels of performance, security, and reliability. Achieving these certifications involves rigorous assessments and adherence to stringent criteria, which can be resource-intensive. These standards not only validate the data center’s capability to provide continuous operation but also enhance its marketability and trustworthiness. Implementing and maintaining these standards requires ongoing effort and investment in technology, personnel training, and regular audits to ensure compliance and continuous improvement. 

Environmental impact assessments (EIAs) are essential in the planning and construction of ASEAN data centers to mitigate their environmental footprint. These assessments evaluate the potential environmental effects of a proposed data center, including energy consumption, water usage, and carbon emissions. Conducting thorough EIAs helps in identifying and implementing strategies to reduce negative impacts, such as incorporating renewable energy sources, optimizing energy efficiency, and utilizing sustainable materials. Moreover, data centers often face scrutiny from regulatory bodies and the public regarding their environmental impact, making it crucial to demonstrate proactive environmental stewardship.  

Best practices for data center construction in 2024 

  1. Planning and design

Recommended strategies for building data centers in 2024 stress thorough planning and inventive design to tackle changing requirements and sustainability targets. Integrating modular and scalable design approaches is essential to meet the dynamic requirements of data center operations. Modular designs allow for flexible and rapid deployment, enabling data centers to scale operations seamlessly as demand increases. This approach also simplifies maintenance and upgrades, reducing downtime and operational disruption.  

Prioritizing energy-efficient designs and renewable energy sources is another crucial practice. Data centers are notorious for their high energy consumption, making energy efficiency a top priority. Implementing designs that maximize natural cooling and ventilation can significantly reduce the reliance on energy-intensive mechanical systems. Additionally, incorporating renewable energy sources, such as solar panels and wind turbines, can offset a significant portion of the data center’s energy needs, reducing its carbon footprint and operational costs. Advanced energy management systems that monitor and optimize energy usage in real-time are also vital, ensuring that energy consumption is minimized without compromising performance. 

Utilizing advanced Building Information Modeling (BIM) tools enhances the planning and design process by providing detailed, accurate, and collaborative digital representations of the data center. BIM tools facilitate the integration of all design elements, from structural components to electrical and mechanical systems, ensuring that potential issues are identified and addressed early in the design phase. This reduces the likelihood of costly changes and delays during construction.  

  1. Construction techniques

Building data centers in 2024 involves adopting advanced construction methods that prioritize efficiency, durability, and sustainability as key elements. One of the key strategies is adopting prefabrication and modular construction methods. Prefabrication involves assembling components of the data center off-site in a controlled environment, which ensures higher quality and consistency. These prefabricated modules can then be transported and rapidly assembled on-site, significantly reducing construction time and minimizing disruptions. Modular construction allows for the flexibility to add or remove sections as needed, making it easier to scale operations and adapt to future technological changes. 

Leveraging innovative materials is another critical aspect of modern data center construction. Materials such as high-performance concrete, advanced composites, and recycled steel are being used for their durability and environmental benefits. These materials offer superior strength and longevity, which are essential for the heavy structural demands of data centers. Importantly, the use of sustainable materials contributes to reducing the overall environmental impact of the construction process.  

Implementing robust project management strategies is essential for the successful execution of data center construction projects. Effective project management involves detailed planning, clear communication, and coordination among all stakeholders, including architects, engineers, contractors, and clients. Utilizing advanced project management software can streamline these processes, providing real-time updates, tracking progress, and ensuring that all aspects of the project stay on schedule and within budget. Risk management is also a crucial component, as it involves identifying potential issues early and developing contingency plans to address them.  

  1. Operational considerations

Finally, taking into account operational aspects during construction is vital for improving the efficiency and long-term performance of data centers. Ensuring effective cooling and ventilation systems is paramount, given the intense heat generated by servers and other equipment. Traditional air cooling methods are being supplemented and even replaced by more advanced technologies like liquid cooling and immersion cooling, which provide greater efficiency and energy savings. Effective cooling strategies can not only enhance equipment performance and longevity, but also contribute to reducing the overall energy consumption of the facility.  

Implementing cutting-edge security protocols is another essential aspect of data center operations. Data centers store vast amounts of sensitive information, making them prime targets for cyberattacks and physical breaches. Advanced security measures include biometric access controls, multi-factor authentication, and continuous monitoring systems that detect and respond to potential threats in real-time. Additionally, the use of encryption technologies ensures that data remains secure during transmission and storage.  

Planning for future scalability and technology integration is crucial in the rapidly evolving landscape of data management and processing. As technology advances, data centers must be capable of adapting to new demands and incorporating emerging technologies without significant disruptions. This involves designing flexible infrastructure that can support the addition of new servers, storage solutions, and networking equipment. Modular and scalable design approaches enable data centers to expand their capacity efficiently.  

Future trends in data center construction 

Looking ahead, future trends in data center construction are set to be profoundly influenced by emerging technologies and innovative practices. One major trend is the integration of advanced technologies like 5G, edge computing, and quantum computing. These technologies will demand new architectural approaches and infrastructure that can support faster data processing speeds and lower latency. The impact of these emerging technologies will be substantial, requiring data centers to adopt new cooling systems, power management solutions, and security measures to handle the increased complexity and scale of operations. 

Predictions for the next decade in data center construction include a shift towards even greater sustainability and efficiency. As environmental concerns continue to grow, there will be a stronger emphasis on green building practices, renewable energy sources, and energy-efficient designs. This might involve the use of more sophisticated AI-driven energy management systems and the development of data centers that can operate autonomously to optimize performance and energy use. Additionally, we can expect modular and prefabricated construction methods to become standard practice, allowing for quicker, more flexible, and cost-effective builds that can easily adapt to evolving technological needs. 

Staying ahead in this evolving landscape requires continuous innovation and a proactive approach to adopting new technologies and best practices. Data centers must be built with future-proofing in mind, ensuring they are not only capable of meeting current demands but also adaptable to the technological advancements of the future. With this in mind, the future of ASEAN’s data center construction will be characterized by smarter, more efficient, and environmentally sustainable designs that can keep pace with the rapid evolution of the digital world. 

Get started with PlanRadar on your next data center project – start a free 30-day PlanRadar product trial to find out more! 

Get started in 4 easy steps.

1. Create an account

2. Upload plans

3. Invite team members

4. Download app